Shoring scaffolds
Shoring & design classes.
Shoring scaffolds (falsework) support formwork and structural parts until they can carry themselves. Their safety hinges on the correct design class to EN 12812: A, B1 or B2.
Basics
What a shoring scaffold does.
A shoring scaffold (falsework / centering) carries the loads of formwork, fresh concrete or structural parts until the structure can support itself. EN 12812 governs requirements, design and detailing, dividing shoring into three design classes.
Design classes
Classes A, B1 and B2 to EN 12812.
| Class | Application | Analysis | Proof / method |
|---|---|---|---|
| A | simple structures (e.g. slabs/beams in housing) | span ≤ 6.0 m, height < 3.50 m, limited cross-sections | no shop drawings required; stability proof only if needed |
| B1 | all cases outside class A | full structural analysis | drawings (plan/section), load assumptions, subsoil – simplified design method |
| B2 | demanding shoring | full structural analysis | drawings + more rigorous design method than B1 |
Class A covers simple cases (limited spans and heights) and needs no shop drawings. As soon as a criterion is exceeded, B1 or B2 applies – with full structural analysis; the difference lies in the design method used.
FAQ
Frequently asked questions
When is design class A sufficient?
For simple structures with a clear span up to 6.0 m, height below 3.50 m and limited cross-sections – then no shop drawings are required.
How do B1 and B2 differ?
Both require full structural analysis with drawings and load assumptions; they differ in the design method applied – B2 being the more rigorous.
Brand values
What our customers relied on.
- “Super fast – site visit, quote and erection within a few days.”
- “Highly professional, reliable and more than friendly in communication.”
- “Flexible and solution-oriented on every site.”
ROHRGERÜSTBAU Pronin · Hamburg, Germany · a reputation as a special-scaffolding specialist, earned over many years.
Sources & standards
Standards information is for general guidance and does not replace professional design. Research date: June 2026.
Please note
A knowledge resource on the craft of scaffolding.
ROHRGERÜSTBAU stood for special and high-end scaffolding since 1949, and from 2021 as ROHRGERÜSTBAU Pronin GmbH (Hamburg). The business was given up in 2026 for health reasons. These pages preserve the expertise – as a reference for the trade worldwide.
Found worldwide — without an ad budget.
This page ranks organically, around the world, with no paid advertising — the best proof of what we do. Rabbit Marketing is a full-service partner for e-marketing and online growth across every channel: search visibility (SEO), high-performance websites, content, digital and performance marketing, and branding — so customers find you, understand you and trust you, anywhere in the world.